Skip to Main Content

Hunt Electric - Big Baer Industrial Facility

Hudson, WI

Hunt Electric - Big Baer Industrial Facility

Hunt Electric’s 250,000-square-foot manufacturing facility, Big Baer, features 234,000 square feet of manufacturing space, 13,000 square feet of office and storage space, and a second level with 13,000 square feet of future office and storage space. In 2020, Hunt Electric moved its 150,000-square-foot prefabrication operations – called “Little Baer” -- to Hudson. The company then purchased 17 acres next to the current plant to build “Big Baer,” Hunt’s new 250,000-square-foot facility, which is expected to start production in early February 2023. Big Baer will operate alongside of the existing Little Baer production facility.

Details

Project:

Hunt Electric - Big Baer Industrial Facility

Client:

Hunt Electric Corporation

Location:

Hudson, WI

Size:

263,265 s.f.

Architect/Engineer:

Pope Design Group

Kraus-Anderson Role:

General Contractor

Want to know more about Kraus-Anderson’s approach to your business?

Let’s talk