Hunt Electric - Big Baer Industrial Facility
Hunt Electric’s 250,000-square-foot manufacturing facility, Big Baer, features 234,000 square feet of manufacturing space, 13,000 square feet of office and storage space, and a second level with 13,000 square feet of future office and storage space. In 2020, Hunt Electric moved its 150,000-square-foot prefabrication operations – called “Little Baer” -- to Hudson. The company then purchased 17 acres next to the current plant to build “Big Baer,” Hunt’s new 250,000-square-foot facility, which is expected to start production in early February 2023. Big Baer will operate alongside of the existing Little Baer production facility.
Details
Project:
Hunt Electric - Big Baer Industrial Facility
Client:
Hunt Electric CorporationLocation:
Hudson, WI
Size:
263,265 s.f.
Architect/Engineer:
Pope Design GroupKraus-Anderson Role:
General Contractor